In this article

A factory can act on resource losses before they become higher bills or waste. Resource Efficient and Cleaner Production, often called RECP, applies a preventive approach to how resources are used. Start with one process you can observe and measure. A cutting line, a washing line or compressed air serving a particular workshop can be a useful boundary.

Follow the inputs, output and losses

Walk the process with production, maintenance and quality staff. Identify where electricity, fuel, water and material enter, what acceptable output leaves, and where material becomes trim, rejects or waste. Note start-up, changeover and idle time. Record the meter, count or weighing method you will use for each input or loss. If a main meter serves several processes, obtain a suitable local measurement or document your allocation and its uncertainty.

Build the baseline from a representative period that includes normal operating conditions. Record total use and an intensity measure such as kilowatt-hours per accepted garment or litres per kilogram of fabric processed. Choose a denominator that reflects the process. Record the product mix, operating hours and quality checks alongside the readings so you can compare similar periods.

Read total use and intensity together

Consider an illustrative finishing line. It used 12,000 kWh to produce 8,000 accepted units in the baseline period, or 1.50 kWh per unit. In a later period it used 12,600 kWh for 9,000 accepted units, or 1.40 kWh per unit. Electricity intensity fell by about 7%, while total electricity use rose by 5%. Review the quantity, mix and operating conditions before attributing the difference to a specific change. Reporting both measures helps management understand the result.

Test one preventive action

Choose a loss the team can observe and address, such as compressed-air leaks or high material losses during a changeover. Agree who will measure the result, the expected effect, and the quality and safety checks that must pass. Ask qualified staff to review proposed equipment or process changes. Repeat measurements under comparable conditions. Watch for changes in rejects, rework, maintenance effort and water or material use so improvements in one area do not shift costs or waste elsewhere.

Keep a short record of the baseline, action, measurements and decision. Use it to choose whether to maintain, adjust or extend the change. Give the owner a review date so improvements remain part of regular operations.

Further reading

National Cleaner Production Centre Sri Lanka’s RECP programme for industry

UN Environment Programme’s cleaner production implementation guide for companies